631G
Senior Member
Has anyone dealt with installing a temp bridge for loader traffic to shuffle equipment and materials across a creek that is not able to be piped temporarily? If you have what beam section did you recall using? I am looking at finding an old equipment trailer and pulling the axels out from underneath it, but thought that possibly buying the steel and decking with some crane mats might get the job done cheaper and faster.