Busy fun day on the job Wednesday. We had excavated inside a building with vac trucks to re-route a sewer line for a remodel. The trench was ~8' deep, 4' wide and 50'+ long, and inside an operating care facility.
The piping was all done and connected and we needed to backfill, so we hired a bark blower truck to blow pea gravel in through the windows with a hose.
I had mobilized the 120 excavator the day before, and today I hauled in 5 loads of pea gravel. I dipped it out of my truck and dumped into the bark truck, one hour round trips and kept them working and not driving to get more gravel. We placed 72 tons of gravel in 6 hours.
It was my first go with blowing in pea gravel. It went as well as it could.
The shallow end, just getting started. I never had time to go back as I was busy hauling and loading it into their truck
View attachment 255289