whitemike
Well-Known Member
I am in the process of putting a Seppi rotary mulcher on a 02 SL160LC Kobelco Dynamic Acerra S# ym02u0469. I sent my machine and mulcher oil and pressure requirements to SUN Hydraulics and they put me a priority flow valve together with the instructions on where and how to install it. On the mulcher motor itself it has 3-#3/4 lines, the pressure line A. runs to my SUN flow valve, another line B.(case drain) i am running it back to hyd. tank, the 3rd line C. just returns oil from motor( it still has some pressure ). I don't know exactly where to plumb this line to my machine at. Could anyone help me with this? a picture of someone pointing at the location would be wonderful but may not be possible. But a good explanation will help me alot. Just to say this my machine has an unused hammer valve, which i think also is a one way oil flowing circuit. Is it possible to use its fittings at the valve banks to hook my return line? Any help would be appreciated