• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Oroville Spillway Repairs

DMiller

Senior Member
Joined
Feb 21, 2010
Messages
16,558
Location
Hermann, Missouri
Occupation
Cheap "old" Geezer
Do not care how they treat it or compact it it is the nature of concrete to shrink and swell with moisture and or temperature. It is going to crack, just how bad is up to the elements and the batch master.
 

Birken Vogt

Charter Member
Joined
Nov 30, 2003
Messages
5,320
Location
Grass Valley, Ca
Do not care how they treat it or compact it it is the nature of concrete to shrink and swell with moisture and or temperature. It is going to crack, just how bad is up to the elements and the batch master.

In the most recent video Juan mentions something like 30' square slabs with sealed expansion joints. Not sure how they are going to do that but it sounds like the right idea. Remember in the pre-failure videos how much water was pouring out all the drains.
 

fast_st

Senior Member
Joined
Dec 1, 2010
Messages
1,468
Location
Mass
Occupation
IT systems admin
Brown water even, much more scary! But the volume of water was impressive. Maybe slabs with rebar pockets and pins and that nice goop they glue runways together with.
 

Jim D

Senior Member
Joined
Nov 11, 2012
Messages
408
Location
California
Occupation
equipment operator
hvy 1ton, thanks for posting the link to the report. Looking at the report, it doesn't surprise me that the spillway was in a poor state of repair. California has been 'running on empty' for many years.

The California DWR never had enough 'time or money' to maintain and fix the spillway, but they are 'heros' now, and they will replace or repair it in an 'amazingly short' amount of time. For an amazing amount of money.
 

hvy 1ton

Senior Member
Joined
Jul 24, 2006
Messages
1,945
Location
Lawrence, KS
It wasn't just poorly maintained, it wasn't designed or built all that well either. The fact that a lot of the floor was poured on weathered rock probably takes the cake. Runner up, they had water infiltration issues in the sub base before they finished pouring the spillway. Second runner up, the trees the inspectors asked them to remove i don't know how many times.
 

fast_st

Senior Member
Joined
Dec 1, 2010
Messages
1,468
Location
Mass
Occupation
IT systems admin
I gotta say Juan Browne is one hell of a Journalist. Hope he gets to write off all of his flight time :)
 

fast_st

Senior Member
Joined
Dec 1, 2010
Messages
1,468
Location
Mass
Occupation
IT systems admin
I wondered how they got that rock so clean with just fire hoses, now I see, rubber squeegee (cut up old tire) on an excavator.
I was watching them wash and scrub and thinking, open the spillway a bit, it'll wash everything off in a hurry even with the gap in the upper spillway, maybe use some of that 18 inch heavy wall flexible plastic pipe, start a siphon and aim it with the excavator.
 
Top