More pics.
1. Is of our spare bucket. 7,5m3 and 10500kg weight(empty) apr 21' lbs.(rented 350 behind, and at another tunnellopening)
2.and 3. Is of one of our L350F who load the 605's in first post.
4. Is from the tipping area.
5. Some of the masses is transported with barges.
Our machines live a VERY hard life in the tunnell operations.![]()


(rented 350 behind, and at another tunnellopening)

Reply With Quote


MTVR's had to be involded. 

