Page 3 of 3 FirstFirst 123
Results 31 to 32 of 32

Thread: Slope requirements?

  1. #31
    Senior Member tootalltimmy's Avatar
    Join Date
    Aug 2008
    Location
    Okanagan Falls B.C. Canada
    Posts
    396
    They were recently going for $75 for #1 grade blocks. This was a sale price, normally $75 for #2 grade and more for #1.

  2. #32
    Junior Member
    Join Date
    Jun 2011
    Location
    So Cal
    Posts
    14
    I wouldn't touch it without having an geo tech engineer look at it. I'm not too familiar with brick and mortar retaining walls but the material alone would cost a lot I would imagine. I personally would do a backcut and then do a butress fill with a gravel subdrain every 10-15 ft in elevation to rid off any seepage at the contact line. Not sure if that is a common practice in your neck of the woods but I have done many butress slopes here in Cali and have never seen one fail.

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •