• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

Hoover Dam Bypass pics

DPete

Senior Member
Joined
Feb 21, 2007
Messages
1,677
Location
Central Ca.
I thought these were tremendous pics of what our country is still capeable of once we get past the enviromental issues that hold back so many projects. In other words, we can still kick some a$$ ( now you leave that alone mods)
 

Attachments

  • image001.jpg
    image001.jpg
    61.2 KB · Views: 2,674
  • construction aerial_2.jpg
    construction aerial_2.jpg
    67.1 KB · Views: 2,679
  • closeup arch w dam.jpg
    closeup arch w dam.jpg
    38.5 KB · Views: 2,657
  • looking northeast.jpg
    looking northeast.jpg
    50 KB · Views: 2,674

EGS

Senior Member
Joined
Jul 27, 2009
Messages
577
Location
Southern Wisconsin
Occupation
Local 139 operator
Pictures do not due that justice. I seen that in the winter of '07 when the arch was not there. It was just HUGE!
 

heavylift

Senior Member
Joined
Sep 5, 2009
Messages
1,046
Location
KS
cool ..... but I don't think I would like standing out there...
Is the cabling temporary or is it part of the bridge...
 

Tanstaafl

Active Member
Joined
Nov 22, 2007
Messages
40
Location
IA/NE
cool ..... but I don't think I would like standing out there...
Is the cabling temporary or is it part of the bridge...

It's all temporary. Once they complete arch I'd imagine they'll ctart removing the cables. When it's complete there should be nothing above the road deck. Should be very, very impressive.
 

DPete

Senior Member
Joined
Feb 21, 2007
Messages
1,677
Location
Central Ca.
All I have, I'm gonna ride my Harley across it if the guard rails are high enough
 

Attachments

  • bridge 4.jpg
    bridge 4.jpg
    48.8 KB · Views: 2,578
  • bridge 5.jpg
    bridge 5.jpg
    41.4 KB · Views: 2,566
  • bridge 6.jpg
    bridge 6.jpg
    67.4 KB · Views: 2,571
  • construction aerial_3.jpg
    construction aerial_3.jpg
    52.2 KB · Views: 2,566
Last edited:

Tanstaafl

Active Member
Joined
Nov 22, 2007
Messages
40
Location
IA/NE
All I have, I'm gonna ride my Harley across it if the guard rails are high enough

Are those 42" high wooden guardrails good enough in that picture or do you want wait until they put the steel and concrete ones up?:D
 

stock

Senior Member
Joined
Aug 4, 2008
Messages
2,022
Location
Eire
Occupation
We have moved on and now were lost....
Brilliant,saw the start of the project on discovery a while back and I really hope they do a follow up,it's a fantastic structure and a credit to any construction crew where ever it is built.
Well done to all involved,May we hope to see some more pictures......
 

I AM IRONMAN

Well-Known Member
Joined
Feb 23, 2009
Messages
156
Location
Spearfish, SD
Occupation
Sales & Consultant Rep.
Looks like an amazing project!
What kind of cost is involved in building the bridge and bypass?
 

JDOFMEMI

Senior Member
Joined
Jan 3, 2007
Messages
3,074
Location
SoCal
Thanks for the pictures. I have been wondering about how it is coming. Looks like it is close to the closure pour for the arches.
That is something to be proud of.

It is scary to see the reservoir behind the dam so low on water though. We need some wet winters to fill it back up.
 

RonG

Charter Member
Joined
Dec 2, 2003
Messages
1,833
Location
Meriden ct
Occupation
heavy equipment operator
Call me candyass but I could never work up there.My knees shake looking at the pictures.LOL.I have all the respect in the world for those tradesmen.
I watched the webcam while they were building the Penobscot Narrows bridge,we called it the "Bucksport bridge" from Verona island to Prospect really up in Maine and I marveled each day as it progressed to completion.One of the towers has an observatory at the top and I went up in the elevator one time when I was in the area.The top floor is 425' from the bottom,not sure if it is sea level or what but I practically froze when the elevator door opened,all I saw was glass and some grab rails and the lady attendent.....lol....AND the defibrillator hung on the wall there.
There were two floors above the elevator shaft.........yeh....I went up the stairs but I was hanging on!!It sure was nice to get back on the ground.Ron G
 

digger242j

Administrator
Joined
Oct 31, 2003
Messages
6,664
Location
Southwestern PA
Occupation
Self employed excavator
In other words, we can still kick some a$$ ( now you leave that alone mods)

"Ass" is only a three letter word, and it's never been on the auto censor list, so you've got nothing to worry about. ;)

As for the pictures, Holy *%&# !! :eek:
 

DPete

Senior Member
Joined
Feb 21, 2007
Messages
1,677
Location
Central Ca.
"Ass" is only a three letter word, and it's never been on the auto censor list, so you've got nothing to worry about.:
Glad that meets your criteria Digger because over moderation and censorship are bad things. I'd hate to have them come between us. DP
 

stock

Senior Member
Joined
Aug 4, 2008
Messages
2,022
Location
Eire
Occupation
We have moved on and now were lost....
Well this old buzzard is a flightless bird likes to have two feet on the ground,and that's the main reason I became a muck shifter "no working at heights".
 

alan627b

Senior Member
Joined
Nov 4, 2006
Messages
785
Location
Omaha Nebraska
Occupation
Heavy Equipment Operator
It's really coming along nicely. Looks a bit different than when I saw it 2 years ago.
I see the water level behind the dam is till down quite a ways though...
hope it goes back up again someday.
 

Truck 505

Well-Known Member
Joined
Apr 25, 2009
Messages
119
Location
Fairfield, OH
The white ring around the lake is the highest the water level ever was during a flood. I believe that took place in the early 80's sometime but I am not sure.
If I recall correctly, the water level has only been that high two times, once on purpose to make sure the spillways worked right and another during a flood. Normal pool is below that ring probably at about the level you see in those pics.
 
Top