View Full Version : The gym is open
ddigger
01-08-2010, 01:08 PM
This was the last of the stuctures on that school demo where I found the tunnel.( http://www.heavyequipmentforums.com/Forum/showthread.php?t=15782)
Now its on to the next one.
54031
54032
54033
54034
what's your next demo job going to be, ddigger?
ddigger
01-16-2010, 11:03 AM
Wolf, Rumor has it, The old Navel base on Skaggs Island.
Wolf, Rumor has it, The old Navel base on Skaggs Island.
keep me posted. would love to get some photos, okay?
Demoguy324
01-20-2010, 10:52 PM
...
Demoguy324
01-20-2010, 10:55 PM
Wolf, Rumor has it, The old Navel base on Skaggs Island.
Jeez, have fun on that one! environmental nightmare! there was around $1.5 mil in asbestos abatement work alone on that job, and with all the tweakers, about 5 Lb of copper on the entire site.
ddigger
01-21-2010, 08:57 PM
Jeez, have fun on that one! environmental nightmare! there was around $1.5 mil in asbestos abatement work alone on that job, and with all the tweakers, about 5 Lb of copper on the entire site.
__________________
I here you! The abatement is going on as we speak, and security is now in place.Work on the bridge is nearly completed to allow heavy loads. On this one I am going in as an owner operator, so the abatement problems, and logistics fall to others. Its amazing, I have never before seen scrap thieves willing to dig (by hand) and go below ground before. Must be a sign of the times.
Powered by vBulletin® Version 4.1.12 Copyright © 2013 vBulletin Solutions, Inc. All rights reserved.