BLASZER
01-01-2009, 05:21 PM
My pics of setting an80 ton beam in N.collins NY...There were 12 of them 144 feet long 6 1/2 feet wide, 7 1/2 feet tall . http://i34.photobucket.com/albums/d137/BLASZER/boomup.jpg

Lashlander
01-01-2009, 06:13 PM
All the link gets me to is the one pic. I do like the 518 though!:thumbsup

qball
01-01-2009, 08:34 PM
ya' gotta love the table top controls.

BLASZER
01-01-2009, 09:17 PM
I'll get more up tomorrow.....

insleyboy
01-01-2009, 09:40 PM
518, is that a linkbelt Lashlander? How many ton crane and parts of line?

Lashlander
01-01-2009, 11:39 PM
Our 518 is rated at 150 ton and has a 6 sheave tip. With a whip line you can have 10 parts of line. Our 150 ton DR Johnson block has 5 sheaves. We run 4 parts unless we have a pick we need more then we rig it accordingly.

BLASZER
01-02-2009, 08:18 AM
Yep, its a Link Belt...150 ton crawler....I dont remember, either 5 or 6 parts of line....It was a tandem pic with a 300 ton hydraulic....He would set it on the slider beam and shoot it across...Then he would regrab it at the opposite end and I would grab it while swung off to the side....Then I would swing perpendicular with the beam and walk 30 feet to the furthest point on the pier...Pictures will clear it up a bit....I need to get onmy other comp to post more pics.

BLASZER
01-02-2009, 11:45 AM
This will be easier.......Look under 08 photos ...https://www.nysdot.gov/portal/page/portal/regional-offices/region5/projects/us-route62-clear-creek/photos

AtlasRob
01-02-2009, 05:00 PM
Not 100% sure if these are ones but at least it gives the dial up boys a chance.

31107

31109

31111

BLASZER
01-02-2009, 05:03 PM
Yeah baby! Thanks Rob....As you can see, I had a front row seat to see the beams....I couldnt sleep for a month before the week of the pics! Any q's , I'll be happy to answer! Steve

Buckethead
01-09-2009, 08:13 PM
Please, please more pics of the old Link-Belts in action. Beautiful machines.

Longboom
01-10-2009, 08:08 PM
Hi All, I've run many 518's over the years and they are sweet machines when there running good and adjusted right. They are a man. Right now I'm running a 200 ton linkbelt with a luffer. Sweet machine.

http://i71.photobucket.com/albums/i123/Crash57/DSCF1575.jpg

AtlasRob
01-11-2009, 05:41 AM
Right now I'm running a 200 ton linkbelt with a luffer.



Now thats what I call a crane, you aint bragging with a handle like that :notworthy

I'll post the picture as a lot of guys have dial up and have difficulty viewing the pictures.

32047

Dualie
01-11-2009, 08:48 PM
wow that's a damn nice red iron project. im jealous of your lay down shake out area. the last 10 jobs I have been on their hasn't been any lay down at all. trucks bring in that days iron as needed when needed strait from the fabricator

Longboom
01-12-2009, 06:41 PM
:usa Yeah Man, I know what you mean Dualie. This was a rare one. As soon as we got done with this building we swung around and did another one right behind the rig. Did two 10 stories with penthouses in just under 6 months. I've been with this outfit for the last 9 years, but I'm bout ready to cut'em lose. They started small and now there so big they have me living out of a suitcase about 85% of the time. I like my house and prefer to live there. If the next job is out of town,........... They might have to find'em a new man or at least come up with a little more insentive. :drinkup

PS Hey BLASZER, Sorry about stealing your thread didn't mean to do that, Sorry.

BLASZER
01-15-2009, 08:20 PM
No sweat Dude....Its all about cranes....Its all good! Steve

fensoncont.
02-05-2009, 06:50 PM
Excellent pictures! Very cool seeing bridge beams set like this, very cool.

In the second picture, what is the steel structure on this side of the bridge being constructed? What is it used for? I've heard the term 'Support Structure' - is that what this is?

Also, I was curious on forming the bridge deck. I remember learning that a 220' bridge, that was 40-50' wide took 4 laborers and 4 carpenters 2 months to form the deck and the overhang. Also, how long does it take to remove the lumber under the deck that was used for forming? Can that be reused on other bridge decks or is it basically ripped out of there?

Thanks for your help and I hope to see more great pictures from you!

insleyboy
02-05-2009, 09:37 PM
Well my answer may help you fensencont. These days lumber to support a bridge deck is nearly obsolete. Metal decking was the new way to deck the deck so to speak, at least it was 5 years ago when I worked in that field. In most cases the concrete beams were set. Small metal tabs were poured into the beams. Angle iron can then be welded to both sides of the beam and act as a whaler. Metal decking is then welded over the angle and your deck is then poured. The decking stays under the bridge for the life of the span and will actually work as a deterrent or a safeguard from spalling or rotten concrete from falling off old decks. The old plywood plus wood whaler, false decking ... Yes it was a tremendously long process to deck a bridge. Then to remove all this lumber you had long hard man hours, many lane closures...exc... The lumber was ok, but after a few re-decking and stripping procedures, much of the lumber will be too chewed up from the stripping mostly that all it was good for will be false decking. Hope that helps ya out!

fensoncont.
02-05-2009, 09:41 PM
Yeah, that helped me out. Thanks! Some projects here in Ohio ODOT will not allow SIP Forms. The bridge I watched being poured I think still utilized lumber.

BLASZER
02-06-2009, 05:41 AM
We call them erection towers.The slider beam sets on the sbutment on one end and onthe erection tower on the other end.....The first crane sets one end on the dolly which rides on the slider beam....He then regrabs the beam at the other end and sends it across where I would then grab it.....When its time for the last beam, We slide it across, then stack it up on the previously sae beams so we can remove the slider and towers....Then place the beam where it belongs.....For forming.....These were concrete beams so galvanized pans were placed between the beams ...They stay there.....Timewise,It all depends on if you include the sbutments, sleeperslabs, and approaches.....I'll loook through my records to see how long it took....Steve

RoadDoc
02-13-2009, 04:45 AM
Howdy Blaszer!

Was that a Whitford job or did they just make the beams for your project?

BLASZER
02-15-2009, 01:27 PM
Union Concrete out of West Seneca NY.......Whitford made the beams..........We did 2 bridges on RT 62 IN COLLINS NY....This was the 2nd....